| Cel-A-Fill |
|
|
|
Fly Ash Slurry - Fill Material
This section governs the furnishing of all labor, equipment, tools, and materials and the performance of all work necessary for construction of CELL-A-FILL slurry for filling voids. Materials: Material Control and Quality: No material shall be used until it has been certified or tested for compliance with specifications approved by the Engineer. Materials: The CELL-A-FILL slurry for use in construction of this fill shall conform to the following requirements.
Handling, Mixing and Proportioning: Storage: The fly ash shall be stored and handled in closed, waterproof containers prior to fill. If storage bins are used, they shall be completely enclosed. Other methods of storage are subject to the approval of the Engineer. Fly ash that has been partially caked or set, shall not be used. Environmental Limitations: CELL-A-FILL shall be placed at ambient air temperatures above 20°F. Composition of the CELL-A-FILL: CELL-A-FILL slurry mixtures shall consist of Class C fly ash and water; or Class C fly ash, a retarder and water; or Class C fly ash, a retarder, a foaming agent and water. The slurry, if specified by the Engineer, shall contain line aggregate. Mix Design Criteria: Laboratory test specimen(s) of the CELL-A-FILL mix, combined in proportions of the job mix design, shall be prepared and tested and shall meet the following requirements.
The CELL-A-FILL slurry fill material shall be placed to fill the voids and to the grades shown on the plans, or directed by the Engineer. |





Scope:
Construction Details: