Over 80 years of experience in structural stabilization and foundation work, including engineering and contractor services related to drilling and grouting, anchor and tieback systems, installation of instrumentation, and cellular concrete and fly ash placement.

 

About Us

 

Request Information from us, we'll respond promptly!
All the information below is optional; simply complete what is relevant.

Company:
Name:
Address:
City, St, Zip:
Country:
Phone:
Fax:
Email:
Please check the brochures you would like to receive:

General brochure
"Experienced Solutions"-general brochure on services offered

Soil Nailing
"Soil Nailing" - 4 pg brochure
"Soil Nailing at the Home Depot"-case study, reprint from Land and Water magazine, May/June 2001
"Soil Nailing: DOTs Warm Up to New Technology"- case study with sculpted, stained facing. reprint from  Better Roads magazine, July, 2003


Anchoring
"Anchoring" - 4 pg brochure
"An Innovative Solution"-case study of anchoring at Lock and Dam#1, Minneapolis. Innovative rock bolting of unusually high bin wall, and the design of new equipment to accommodate the work. reprint from Midwest Contractor magazine, September 24, 2001


Grouting
Jet Grouting
Compaction Grouting
Chemical Grouting-Milwaukee Harbor-a new approach to marine structure repairs
Compu-Grout System- real-time, integrated system for control, monitoring, and documentation of grouting operations
Rockfill Consolidation-Morris Sheppard Dam, Graford, TX-case study
Drilling and grouting- Rocky Mountain Pumped Storage Plant, Armuchee, GA-case study
Dam grouting-Cedar Lake Dam, Clinton, OK-consolidation grouting and grout curtain wall


Mine Stabilization Abatement
Wabash Valley Correctional Institute, Carlisle, Indiana-case study
Rock Springs, WY Pumped Grout Project- case study
Island Creek Coal Company, WV-case study of transmission tower stabilization
 

Comment: